会员登录|免费注册|忘记密码|管理入口 返回主站||保存桌面|手机浏览|联系方式|购物车
广州市朝德机电设备有限公司
商家二维码
手机查看商家
企业会员 1  
加关注0
13826285285

广州市朝德机电设备有限公司

仪器仪表

新闻中心
  • 暂无新闻
产品分类
联系方式
  • 联系人:郑铁晓
  • 电话:86-020-83191853
  • 传真:86-020-83190556
站内搜索
 
荣誉资质
  • 暂未上传
友情链接
  • 暂无链接
首页 > 供应产品 > Unipower继电器HPL110
Unipower继电器HPL110
单价 2000.00 / 台对比
询价 暂无
浏览 841
发货 广东广州市
库存 10台
产品系列 其它
触点形式 其它
过期 长期有效
更新 2024-11-27 17:36
 
详细信息
产品系列 其它
触点形式 其它
应用范围 其它
品牌 Unipower
型号 HPL110

Unipower继电器HPL110

is among the leading products when it comes to digital

and analogue load monitors and measurement transducers

Technical data

Mechanical

Housing: Makrolon UL94V-1 (housing)

Makrolon UL94V-2 (konnector)

Mounting: 35 mm DIN rail- or wall mounting

IP class: Housing IP40

Connector IP20

Temp range: -15 to +50

o

C

Weight: 400 g

Dimensions:D 75 x B 56 x H 110 mm

UL certif.: UL508. File E190959

Electrical

Supply/measurement: See technical info on the unit

Available: 3x120 to 3x575V~

Current range: Internal max 8 A~

Eksternal N/1 or N/5 A~

Frequency range: 50/60 Hz

Consumption: 3 VA

Relay output: 250V~/5A~

Analogue output: 4-20 mA max 400 ohm

CE mark to: EN50081-1, EN50082-2,

EN61010-1

Load monitor with Max./Min. limit

Unipower HPL110

Generally

Low cost kW-meter with built-in functions

for control and supervision of AC-motor

driven equipment. A very popular and

inexpensive unit. The more advanced

functions implemented in our HPL400

family are not present in this unit. The unit

is used by several manufacturers of pumps,

conveyors and special machinery. Some of

these have their own logo on the front plate.

This is also an option for future customers.

Features

* kW[%] measurement

* Digital programming

* Start timer 0,1-99.9 sek

* Reaction timer 20ms-99.9 sek

* Max. limit 5-**

* Min. limit 5-**

* 2-points regulation

* Built-inPeak detector

Applications

* Pump supervision (Max. and Min.).

* Supervision of conveyor belts.

* Simple overload supervision of

cranes.

* 2-points regulation via hysteresis on

the Max.- or the Min.-limit.

* Other machinery where an alarm is

required on a given motor torque

(Max. and Min.).

Hydria Elektronik ApS Tlf: 98293433 Home page:

Følfodvej 36 Fax: 98293286 E-mail: hydria@unipower.dk

Dk-9310 Vodskov

Unipower product program

Units for DIN-rail mounting (35mm) or panel mounting

(72 x 72).

Measurement transducers: 1- and 3-phased kW-

measurement. Symmetric and asymmetric. Before and

after frequency inverters. Analogue output (4-20mA)

as well as pulse output (kWh).

Load monitors: 3-phased symmetric kW-measure-

ment. Programmable kw-limits: Max., Min and dP/dt.

Support functions: Start timer, reaction timer, hyste-

resis, auto reset, manual reset, alarm blocking etc.

Analogue output (4-20mA).

Tool supervision: Kompact units for supervision of

up to 16 cut. Measurement of power and work for

break, wear and missing tool. Monitoring program for

installation and statistics, for DOS or Windows.

Typical wiring

The Figure above shows a typical AC-motor power

consumption curve immediately after power has been

applied to the motor. The bars at the bottom of the figure

indicate power applied to the unit and the position/state

of the relay (On/Off). The figure shows the functions

and the parameters of the HPL110 in two different

situations; hysteresis on the Max. limit and hysteresis on

the Min. limit. Note that the use of hysteresis on the Min.

limit requires the Max. limit to be Off.

3

M

~

L1

L2

L3

Motor

In>8Amp.

ExternalC.T.

Fuses

Aut.Reset

Ext.Reset

K

9

11

13

14

15

NC

C

NO

S1

S2 16

1

3

5

7

8

L1

L2

L3

k

l

HPL110

10

Gnd

only ifmin. limit used

12

P[%]

**

75%

50%

25%

Threshold 5%

PowerOn

RelayOn

Ts

Tr

Tr

t

Auto-Reset

Auto-Reset

Min.Hyst’sband

Max.Hyst’sband

Min. limit

Max. limit

P=f(t)

Note! The Max. limit must be Off

when using hysteresis on the Min. limit